Flat roof renewal at Hailsham Memorial Institute, Western Road for Hailsham County Council, with full scaffolding, site setup, and a complete roofing system installation.
Key Tasks
Scaffolding and Site Setup: Full site preparation, including health and safety measures.
Old Roof Removal: Stripping the existing roof and preparing the surface.
Installation of BMI Total Torch System: Applying a high-performance waterproofing system.
Self-Adhesive VCL: Installing a vapour control layer for moisture protection.
130mm Insulation: Enhancing thermal efficiency with a new insulation layer.
Vapour Dispersion Layer: Ensuring proper ventilation and condensation management.
Thermaweld Capsheet: Applying a durable top layer for long-term performance.
New Plastic Fascia: Installing new fascia for a clean and modern finish.
Old AC Units Removal: Taking out outdated units and joisting and plying affected areas
Benefits
Improved thermal efficiency with upgraded insulation.
Long-lasting weatherproofing with the BMI Total Torch System.
Enhanced safety and site management as the main contractor.